Rules for German plug-in solar devices (Steckersolargeräte): checks the 2 kW mod...

https://rechen.halowerk.com/v1/plug-in-solar-rules

Overview

Rules for German plug-in solar devices (Steckersolargeräte): checks the 2 kW module / 800 VA inverter limits, MaStR registration deadline, metering, no grid-operator notice, feed-in without payment and tenant/condominium rights.

Protocol x402 (POST)
Price $0.0030
Payment Asset USD Coin
Payment Network eip155:8453
Category uncategorized
Provider rechen
Source bazaar
Indexed 2026-11-21 05:10:45

Health

Status unknown
Latency (p50) —
Uptime (30d) —
Reliability Score —
Last Checked Never
Last Healthy Never
Consecutive Failures 0

x402 Payment Validation

Payment Requirements —
Asset Verified —
Facilitator —

Input Schema

{ "body": { "commissioning_date": "2026-11-01", "inverter_power_va": 800, "module_power_w": 1800, "occupancy": "tenant" }, "bodyType": "json", "method": "POST", "type": "http" }

Output Schema

{ "example": { "limitations": [ "Information computed by formula and statutory rules from the stated parameters; not legal, tax, funding or energy advice and no substitute for planning by a qualified professional.", "Electrical safety, product standards (e.g. VDE) and the landlord’s or community’s right to set reasonable conditions are not assessed.", "Installed capacity is taken as the total module peak power supplied by the caller." ], "result": { "commissioning_date": "2026-11-01", "duties": [ { "deadline": "2026-12-01", "id": "mastr_registration", "norm": "§ 5(1), (5) MaStRV", "text": "Register the unit in the Marktstammdatenregister within one month after commissioning." }, { "id": "no_grid_operator_notice", "norm": "§ 8(5a) sentence 2 EEG", "text": "No further notification to the grid operator may be required." }, { "id": "metering", "norm": "§ 10a(2), (3) EEG", "text": "Operation with the existing meter is allowed; the metering point operator installs a bidirectional meter after the BNetzA data check if needed." }, { "id": "unpaid_acceptance", "norm": "§ 21(1) no. 2, § 8(5a) EEG", "text": "Electricity fed into the grid is accepted without payment (unentgeltliche Abnahme)." }, { "id": "technical_exemptions", "norm": "§ 9(1) sentence 3, § 9(2) sentence 3 EEG", "text": "No remote control or 60 % feed-in limit duties." }, { "id": "no_aggregation", "norm": "§ 9(3) sentence 3, § 24(1) EEG", "text": "Not aggregated with other PV systems on the same property for size thresholds." }, { "id": "tenant_right", "norm": "§ 554(1) BGB", "text": "The tenant can demand the landlord’s permission for structural changes serving plug-in solar devices unless unreasonable for the landlord; a special security may be agreed." } ], "legal_basis": { "checked": "2026-11-01", "norms": [ "§ 3 Nr. 43 EEG", "§ 8(5a) EEG", "§ 9 EEG", "§ 10a EEG", "§ 21 EEG", "§ 24 EEG", "§ 5 MaStRV", "§ 554 BGB", "§ 20 WEG" ], "parameters_valid": { "from": "2024-05-16", "to": "open (statute as of 2026-11-01)" }, "sources": [ "https://www.gesetze-im-internet.de/eeg_2014/", "https://www.gesetze-im-internet.de/mastrv/", "https://www.gesetze-im-internet.de/bgb/", "https://www.gesetze-im-internet.de/woeigg/" ], "version": "EEG 2023 as last amended 18.12.2025; MaStRV as last amended 08.10.2026; BGB/WEG as amended by the Act of 10.10.2024 (BGBl. 2024 I Nr. 306)" }, "limits": { "inverter_ok": true, "inverter_power_va_max": 800, "module_ok": true, "module_power_w_max": 2000 }, "qualifies_as_plug_in_device": true, "reasons": [] }, "service": "plug-in-solar-rules", "status": "success" }, "type": "json" }