← Back to directory

Internet adoption milestone returns the first observed year at or above a specif...

https://welt.halowerk.com/v1/wdi-connectivity-internet-milestone

Overview

Internet adoption milestone returns the first observed year at or above a specified percentage and the preceding observation. Use it when an agent needs help dating diffusion of internet access.

Protocol x402 (POST)
Price $0.0050
Payment Asset USD Coin
Payment Network eip155:8453
Category uncategorized
Provider welt
Source bazaar
Indexed 2026-11-24 07:05:39

Health

Status unknown
Latency (p50) —
Uptime (30d) —
Reliability Score —
Last Checked Never
Last Healthy Never
Consecutive Failures 0

x402 Payment Validation

Payment Requirements —
Asset Verified —
Facilitator —

Input Schema

{ "body": { "country": "DEU", "percent": 75 }, "bodyType": "json", "method": "POST", "type": "http" }

Output Schema

{ "example": { "data": { "first_year": 2007, "prior_pct": 72.16, "prior_year": 2006 }, "limitations": "Calculated from ITU indicators via World Bank WDI, CC BY 4.0. 2000–2025. Subscriptions are connections, not people.", "measured_at": "2026-11-24T05:42:12.651Z", "source": { "reference": "https://api.worldbank.org/v2/en/indicator/IT.NET.USER.ZS?downloadformat=csv", "retrieved_at": "2026-11-24T02:27:50.018791+00:00" } }, "type": "json" }