EEG 2023 solar feed-in tariff or market-premium reference value by commissioning...
https://rechen.halowerk.com/v1/feed-in-tariffOverview
EEG 2023 solar feed-in tariff or market-premium reference value by commissioning date (2023-01-01 to 2026-12-31) and size: Bundesnetzagentur rates per size bracket, weighted value per § 23c, payment end and rules on negative prices and the 60 % limit.
Protocol
x402 (POST)
Price
$0.0030
Payment Asset
USD Coin
Payment Network
eip155:8453
Category
uncategorized
Provider
rechen
Source
bazaar
Indexed
2026-11-21 05:10:45
Health
Status
unknown
Latency (p50)
—
Uptime (30d)
—
Reliability Score
—
Last Checked
Never
Last Healthy
Never
Consecutive Failures
0
x402 Payment Validation
Payment Requirements
—
Asset Verified
—
Facilitator
—
Input Schema
{
"body": {
"commissioning_date": "2026-09-15",
"installed_kwp": 9.8
},
"bodyType": "json",
"method": "POST",
"type": "http"
}
Output Schema
{
"example": {
"limitations": [
"Information computed by formula and statutory rules from the stated parameters; not legal, tax, funding or energy advice and no substitute for planning by a qualified professional.",
"Rates from the Bundesnetzagentur tables; aggregation of installations (§ 24), tenant-electricity supplement, tender-based values above 1 MW and special solar installations are not determined.",
"The planned Solarpaket I increase for 40 kW+ is not applied without state-aid approval (§ 101(1) EEG); VAT is not included (§ 23(2))."
],
"result": {
"brackets": [
{
"bracket": "up to 10 kW",
"kw": 9.8,
"rate_ct_per_kwh": 7.7,
"share": 1
}
],
"commissioning_date": "2026-09-15",
"feed_in_mode": "partial",
"installed_kwp": 9.8,
"legal_basis": {
"checked": "2026-11-01",
"norms": [
"§ 21 EEG 2023",
"§ 23c EEG 2023",
"§ 25 EEG 2023",
"§§ 48, 49, 51, 53 EEG 2023",
"§ 9(2) EEG 2023"
],
"parameters_valid": {
"commissioning_from": "2026-08-01",
"commissioning_to": "2026-12-31"
},
"sources": [
"https://www.gesetze-im-internet.de/eeg_2014/",
"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Foerderung/start.html"
],
"version": "EEG 2023 as last amended by Art. 23 of the Act of 18.12.2025 (BGBl. 2025 I Nr. 347); rates per BNetzA"
},
"location": "building",
"notes": [
"Commissioned from 2025-02-25: no payment for quarter hours with negative spot prices (§ 51(1) EEG); below 100 kW this applies only from the year after a smart meter is installed (§ 51(2) no. 1); the payment period is extended (§ 51a).",
"Feed-in tariff installations below 100 kW commissioned from 2025-02-25 must limit the active power fed in at the grid connection point to 60 % of the installed capacity until a smart meter with control unit is installed and tested (§ 9(2) no. 2 b, no. 3, § 100(3b) EEG).",
"Feed-in tariff = market-premium reference value minus 0.4 ct/kWh (§ 53(1) no. 2 EEG)."
],
"payment_rule": "20 years, extended to 31 December of the 20th year (§ 25(1) EEG), plus any extension under § 51a",
"payment_until": "2045-12-31",
"period": {
"from": "2026-08-01",
"to": "2026-12-31"
},
"remuneration": "feed_in_tariff",
"source": {
"publisher": "Bundesnetzagentur",
"retrieved": "2026-11-01",
"table": "Bundesnetzagentur, EEG-Förderung und -Fördersätze, Tabelle VergSaetzeAug26bisDez26.xlsx (Blatt Solar), https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Foerderung/Archiv_VergSaetze/_DL/VergSaetzeAug26bisDez26.xlsx"
},
"value_ct_per_kwh": 7.7,
"value_ct_per_kwh_exact": 7.7
},
"service": "feed-in-tariff",
"status": "success"
},
"type": "json"
}