← Back to directory

EEG 2023 solar feed-in tariff or market-premium reference value by commissioning...

https://rechen.halowerk.com/v1/feed-in-tariff

Overview

EEG 2023 solar feed-in tariff or market-premium reference value by commissioning date (2023-01-01 to 2026-12-31) and size: Bundesnetzagentur rates per size bracket, weighted value per § 23c, payment end and rules on negative prices and the 60 % limit.

Protocol x402 (POST)
Price $0.0030
Payment Asset USD Coin
Payment Network eip155:8453
Category uncategorized
Provider rechen
Source bazaar
Indexed 2026-11-21 05:10:45

Health

Status unknown
Latency (p50) —
Uptime (30d) —
Reliability Score —
Last Checked Never
Last Healthy Never
Consecutive Failures 0

x402 Payment Validation

Payment Requirements —
Asset Verified —
Facilitator —

Input Schema

{ "body": { "commissioning_date": "2026-09-15", "installed_kwp": 9.8 }, "bodyType": "json", "method": "POST", "type": "http" }

Output Schema

{ "example": { "limitations": [ "Information computed by formula and statutory rules from the stated parameters; not legal, tax, funding or energy advice and no substitute for planning by a qualified professional.", "Rates from the Bundesnetzagentur tables; aggregation of installations (§ 24), tenant-electricity supplement, tender-based values above 1 MW and special solar installations are not determined.", "The planned Solarpaket I increase for 40 kW+ is not applied without state-aid approval (§ 101(1) EEG); VAT is not included (§ 23(2))." ], "result": { "brackets": [ { "bracket": "up to 10 kW", "kw": 9.8, "rate_ct_per_kwh": 7.7, "share": 1 } ], "commissioning_date": "2026-09-15", "feed_in_mode": "partial", "installed_kwp": 9.8, "legal_basis": { "checked": "2026-11-01", "norms": [ "§ 21 EEG 2023", "§ 23c EEG 2023", "§ 25 EEG 2023", "§§ 48, 49, 51, 53 EEG 2023", "§ 9(2) EEG 2023" ], "parameters_valid": { "commissioning_from": "2026-08-01", "commissioning_to": "2026-12-31" }, "sources": [ "https://www.gesetze-im-internet.de/eeg_2014/", "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Foerderung/start.html" ], "version": "EEG 2023 as last amended by Art. 23 of the Act of 18.12.2025 (BGBl. 2025 I Nr. 347); rates per BNetzA" }, "location": "building", "notes": [ "Commissioned from 2025-02-25: no payment for quarter hours with negative spot prices (§ 51(1) EEG); below 100 kW this applies only from the year after a smart meter is installed (§ 51(2) no. 1); the payment period is extended (§ 51a).", "Feed-in tariff installations below 100 kW commissioned from 2025-02-25 must limit the active power fed in at the grid connection point to 60 % of the installed capacity until a smart meter with control unit is installed and tested (§ 9(2) no. 2 b, no. 3, § 100(3b) EEG).", "Feed-in tariff = market-premium reference value minus 0.4 ct/kWh (§ 53(1) no. 2 EEG)." ], "payment_rule": "20 years, extended to 31 December of the 20th year (§ 25(1) EEG), plus any extension under § 51a", "payment_until": "2045-12-31", "period": { "from": "2026-08-01", "to": "2026-12-31" }, "remuneration": "feed_in_tariff", "source": { "publisher": "Bundesnetzagentur", "retrieved": "2026-11-01", "table": "Bundesnetzagentur, EEG-Förderung und -Fördersätze, Tabelle VergSaetzeAug26bisDez26.xlsx (Blatt Solar), https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Foerderung/Archiv_VergSaetze/_DL/VergSaetzeAug26bisDez26.xlsx" }, "value_ct_per_kwh": 7.7, "value_ct_per_kwh_exact": 7.7 }, "service": "feed-in-tariff", "status": "success" }, "type": "json" }