Overview

Live strain on the power grids behind the AI data center build-out: real-time demand for ERCOT (Texas), MISO and NYISO, ERCOT headroom against available capacity, demand versus operator forecast and today's peak, with a fixed-rule strain level. Official operator public data, cached 5 minutes.

Protocol x402
Price $0.01
Payment Asset USD Coin
Payment Network eip155:8453
Category AI Infrastructure
Provider X3 Digital Capital LLC
Source self-registered
Indexed 2026-11-25 03:43:40

Health

Status healthy
Latency (p50) —
Uptime (30d) —
Reliability Score —
Last Checked Never
Last Healthy Never
Consecutive Failures 0

x402 Payment Validation

Payment Requirements —
Asset Verified —
Facilitator —

Input Schema

{ "method": "GET", "queryParams": {}, "type": "http" }

Output Schema

{ "example": { "asOf": "2026-11-25T03:33:43.416Z", "coverageNote": "Covers ERCOT (Texas), MISO (Midwest and South Central) and NYISO (New York), large grids whose operators publish real-time load without a login. PJM (Virginia, the biggest data center market) needs credentials for real-time load and CAISO (California) blocks cloud server access, so neither is included. No operator publishes how much of its load is data centers. Strain levels are fixed-rule readings of each operator's own numbers, not operator alerts.", "disclaimer": "Not financial advice. Operator data is provisional, can be revised, and is not an alert or a reliability forecast. Cached for up to 5 minutes.", "grids": [ { "availableCapacityMw": 77128, "dataAsOf": "Nov 24, 2026 21:33:30", "demandMw": 57058, "gridFrequencyHz": 60, "headroomMw": 20070, "headroomPct": 26, "id": "ERCOT", "name": "ERCOT", "netLoadMw": 52059, "region": "Texas", "solarMw": 1, "status": "ok", "strainBasis": "Headroom between actual demand and the generation capacity ERCOT reports as available (under 8% is high, under 15% is elevated).", "strainLevel": "normal", "timeZone": "US Central", "windMw": 4997 }, { "dataAsOf": "24-Nov-2026 - Interval 22:30 EST (MISO reports in EST year-round)", "demandMw": 81869, "demandVsForecastPct": 4.1, "forecastPeakTodayMw": 83809, "id": "MISO", "misoForecastMw": 78620, "name": "MISO", "peakDemandSoFarTodayMw": 86282, "region": "Midwest and South Central", "status": "ok", "strainBasis": "Actual load above MISO's own hourly load forecast (5% or more is elevated, 10% or more is high). This feed carries no capacity headroom figure.", "strainLevel": "normal", "timeZone": "US Eastern (EST, no daylight saving)" }, { "dataAsOf": "11/24/2026 22:20:00 EST", "demandMw": 17126, "demandVsForecastPct": 3.6, "forecastPeakTodayMw": 18787, "id": "NYISO", "isoForecastMw": 16535, "name": "NYISO", "peakDemandSoFarTodayMw": 19298, "region": "New York", "status": "ok", "strainBasis": "Actual load above NYISO's own hourly load forecast (5% or more is elevated, 10% or more is high). NYISO publishes no capacity headroom figure in these files.", "strainLevel": "normal", "timeZone": "US Eastern" } ], "overall": { "gridsAtElevatedOrHigh": [], "gridsReporting": 3, "gridsRequested": 3, "highestStrainLevel": "normal" }, "source": { "ercot": "https://www.ercot.com/content/cdr/html/real_time_system_conditions.html", "miso": "https://public-api.misoenergy.org/api/RealTimeTotalLoad", "note": "Official grid operator public data, read live. Cached up to 5 minutes.", "nyiso": "https://mis.nyiso.com/public/csv/pal and https://mis.nyiso.com/public/csv/isolf" }, "summary": "Across ERCOT, MISO, and NYISO, the highest grid strain reading right now is normal. Texas (ERCOT) demand is 57.1 GW against 77.1 GW of available capacity, leaving 26.0% headroom, which is normal. Midwest and South Central (MISO) demand is 81.9 GW, 4.1% above forecast, which is normal. New York (NYISO) demand is 17.1 GW, 3.6% above forecast, which is normal. PJM (Virginia) and CAISO (California) are not covered, and no operator publishes data center load on its own. Not financial advice.", "units": "Megawatts (MW) of instantaneous demand unless stated" }, "type": "json" }